Myriad Wind Energy Systems secures investment for crane-free turbine assembly

Published

An estimated £415.9k has been secured by Myriad Wind Energy Systems Limited to develop the Myriad Turbine, a modular and scalable multi-rotor system that can be assembled on-site without cranes. Based in Stirling, the company targets the distributed wind market by supplying power directly to remote locations and energy-intensive businesses. This technology is designed to meet industrial demand for larger offshore turbines and secure a renewable energy future.

The business was incorporated in 2021 to build the next generation of high performance wind turbines. This latest capital injection follows a previous funding total of £865k raised last year. LinkedIn records show the firm currently has eight employees.

Financial accounts for the year ended 31 August 2025 have been filed. (Documentation for this allotment was processed in September 2026).

Share this

Contact the editorial team at editorial@fundingspotter.com