HORNSEA PROJECT THREE (UK) LIMITED develops and operates the Hornsea Three offshore wind farm in the Lorem ipsum dolor sit amet, consectetur adipiscing elit. Sed do eiusmod tempor incididunt ut lSign up to read more
Capital raised per employee divides the equity HORNSEA PROJECT THREE (UK) LIMITED raised in the last six months by the headcount in its most recent filed accounts. It is a rough read on how capital-intensive the business is: a high figure means the company is raising a lot relative to the number of people it employs, which is typical of hardware, biotech and other research-heavy businesses. Headcount comes from annual accounts and so lags the funding date, often by a year or more.
—
£0 raised in last 6 months • 0 employees (FY ending 2024-12-31)
Resigned Officers(27)
ShowHide
These are the directors and secretaries who have left HORNSEA PROJECT THREE (UK) LIMITED. A resignation is filed with Companies House on form TM01 and the date below is the date the officer's appointment ended, not the date it was filed. Departures matter for reading a company's history: a founder leaving shortly after a funding round, or several directors resigning at once, is often the visible trace of a change of control or a restructure.
Andrew Bown resigned 2015-08-21
Joern Harde resigned 2014-06-04
James Baldwin resigned 2026-02-24
James Baldwin resigned 2024-02-19
Wolfgang Bischoff resigned 2015-08-21
Richard Bowyer resigned 2015-08-21
Duncan Clark resigned 2025-10-14
Gabriel Davies resigned 2021-11-30
Philip De villiers resigned 2025-03-03
John Galloway resigned 2022-10-17
PSCs
Persons with significant control are available once you sign up.